Interactive Dashboard
A live overview of your compliance posture with clickable donut charts and KPIs — click any segment to drill straight into the matching records.
InfraTrace360 v9 is here — a redesigned Control Room interface, one-click online updates and two-step sign-in for every account. See what's new
Track exceptions, incidents, policies, vendors, employees, and more from a single dashboard. InfraTrace360 makes ISO compliance simple, auditable, and affordable.
Especially built for
InfraTrace360 provides a complete toolkit to manage IT governance, track compliance, and pass audits with confidence
A live overview of your compliance posture with clickable donut charts and KPIs — click any segment to drill straight into the matching records.
A full risk register with 1–5 likelihood and impact scoring that auto-calculates a risk score and priority, plus controls, triggers, response strategy and review dates.
Update records inline with ease — no more tedious one‑by‑one edits. Save valuable time and focus on the tasks that truly matter.
Attach supporting files to any record in any module — employees, incidents, risks, vendors, service accounts and more — for complete evidence trails.
Add custom text, number, date, select, yes-no or file-upload fields to any module, and change a field's type any time. Tailor the system to your exact needs.
Bulk import records from XLSX or PDF files. Export any module's data — every export is logged — to share with auditors or stakeholders.
Every create, update, delete, import and export is logged with a before/after diff, timestamp, IP address and username. Ready for compliance reviews.
Reduce eye strain with a built-in dark theme. Persisted in your browser preferences for a consistent experience..
Update the whole app by uploading a ZIP from the admin panel, with automatic backups so you can always roll back — no server access needed.
A self-contained analysis engine reads your policies and procedures and scores how well each one aligns with ISO 27001, ISO 20000 and ISO 22301 — running entirely on your own server, with no external AI service, no API keys, and no data ever leaving your hosting.
Analyse any document with one click. The engine extracts the text from Word, PDF, Excel and more, then scores its content against each standard's requirements — instantly, one file at a time, with a live progress indicator.
For every document, the engine determines the best-fit standard from its content and suggests the right ISO tag — so untagged files get classified automatically, and you apply the suggestion with a single click.
If a document is tagged for one standard but its content matches another, the system flags it as a possible mis-tag and recommends a correction — helping you catch filing mistakes before an audit does.
The engine reads the version, reference number, approval date, status, classification and approver name printed inside each document, and offers them as one-click fills for the fields that are still empty.
100% self-hosted · your documents never leave your server
Certification asks two things beyond your documents: that you measure how the system performs, and that management reviews it. InfraTrace360 does both from the records you already keep.
Pre-filled performance measures across ISO 27001, ISO 20000 and ISO 22301 — incidents, patching, penetration testing, access reviews, backups, service levels, continuity exercises and more. Each one names the clause or control it evidences.
Every KPI carries its own target and knows whether higher or lower is better. Type the measured value and the result — met or not met — is worked out for you, then rolled up per standard.
One click produces the review pack: document readiness, KPI results for the period, the risk picture, incidents, and a plain summary of what needs attention — laid out in the order the standard asks for, ready to print or save as PDF.
Findings are stated plainly — KPIs that missed target, risks past their review date, documents still missing — with every section labelled so standard-specific figures are never confused with organisation-wide ones.
Governance is not only about what happens inside your organisation. World Monitor brings trusted, reputable security feeds into one place and — where relevant — checks them against your organisation, so exposure surfaces early. Everything opens safely inside the platform for reference only.
Browse known data breaches and instantly see whether your organisation appears among them, with matching entries clearly flagged.
Focus on breaches sourced from information-stealing malware and stealer logs — the credential dumps traded on dark-web markets — with the same organisation check.
Review vulnerabilities being actively exploited in the wild, including those tied to known ransomware campaigns, with remediation due dates and guidance.
See the latest malicious web addresses and malware samples observed in the wild. Dangerous links are shown safely disarmed, so they can never be opened by accident.
Reputable open feeds, malicious links disarmed for safe reading, and a live count of items reported today on every feed.
The things auditors ask about and administrators worry about now ship with the platform — no plugins, no extra services, nothing to wire together.
Version 9 is a complete visual renovation: a fixed command rail, a frosted top bar with a live signal line, IBM Plex typography in English and Arabic, dashboards that draw themselves in, and bottom-sheet dialogs on phones. Light and dark themes, and it respects “reduce motion”.
Every account confirms a six-digit code from Microsoft Authenticator, Google Authenticator or any TOTP app. Admins can reset a lost phone, and every enrolment and failed code is written to the audit log.
Pull detections from any SIEM with a REST endpoint — nested, Wazuh-style data included — review them by severity, and turn one into an incident with a single click.
Connect LDAP / Active Directory to see directory accounts next to your registers, with a health indicator and an activity log for every connector.
A daily HTML digest of exceptions, service accounts, guests, vendor contracts and calendar tasks that are about to expire or already overdue — sent over the Mailtrap API, with no SMTP ports and no cron job to set up.
Check for a new version from Settings and apply it in place. A full backup is taken first, and your configuration, uploads and backups are never touched.
Every screen, export and audit entry is available in Arabic with a mirrored right-to-left layout — while phone numbers, e-mails and codes keep their left-to-right order.
InfraTrace360 helps you operate and evidence 30+ ISO 27001:2022 Annex A controls across access management, asset inventory, supplier security, incident and risk management, and audit logging
Full employee register with status, department, manager, and photo tracking (add or remove photos any time)
Security exceptions with justifications, expiry dates, and file attachments
Incident register with severity, action taken, and lessons learned
Risk register with likelihood/impact scoring, auto-calculated priority, controls, response strategy and review dates
Track devices by IP, hostname, owner, location, and operating system
All documents with classification, version control, and file storage such as policies and procedures
Vendor management with contracts, NDA tracking, criticality, status and monitoring frequency
Employee-application role mapping with login IDs, grant dates and status tracking
Service account inventory with expiry monitoring and login restriction
Smart calendar organizes infosec tasks, audits, and committee activities
Single-page audit view combining access, exceptions, and assets per employee
Master application registry with assignable roles for access control matrices
Proactive alerts for expiring exceptions, contracts, and service accounts
External personnel and contractor register with sponsor, host and expiry tracking
Whitelist of approved software with versions, approver and least-privilege notes
Complete activity trail of every create, update, delete, import and export
Performance measures for all three standards, pre-filled with 98 KPIs tied to their clause. Enter the figure — met or not met is worked out from the target
Generates the management review pack from your live records, structured to the inputs the standard requires, ready to print or save as PDF
Outside-in threat intelligence, grouped in one place — data breaches, dark-web credential leaks, actively exploited vulnerabilities and live malware activity, with a daily count on each feed
Browse known data breaches and instantly see whether your organisation appears among them, with matching entries clearly flagged
Focus on breaches sourced from information-stealing malware and stealer logs — the credential dumps traded on dark-web markets — with the same organisation check
Review vulnerabilities being actively exploited in the wild, including those tied to known ransomware campaigns, with remediation due dates and guidance
See the latest malicious web addresses and malware samples observed in the wild — dangerous links shown safely disarmed so they can never be opened by accident
Per-standard readiness dashboards for ISO 27001, ISO 20000 and ISO 22301 — met, partial and missing documents scored from your library, with duplicate merging
Directory accounts from LDAP / Active Directory listed alongside your registers, with connector health and an activity log
Real-time detections pulled from your SIEM with severity filters and auto-refresh — convert any detection into an incident in one click
Every module shares the same crisp layout — sortable tables, inline editing, status filters, and file attachments — so there is nothing new to learn as you move between them
Clickable donut charts and KPI cards — click any segment to drill straight into the matching records.
Likelihood × impact scoring with auto-calculated priority, controls, response strategy and review dates.
Click any screenshot to enlarge it
Every feature in InfraTrace360 is designed with ISO requirements
Organizations waste countless hours managing compliance through scattered spreadsheets, email threads, and disparate tools. InfraTrace360 unifies everything in one purpose-built system.
With full audit trails, role-based access, and customizable fields, you can adapt the platform to any compliance framework while maintaining rigorous documentation standards.
Unlike other bloated platforms, InfraTrace360 is lightweight and can work on Linux, Windows and even Mac
The first and only Arabic-enabled platform for ISO compliance and information security in the region, built to empower organizations with clarity, confidence, and compliance.
On-Prem means your data stays on your servers. No third-party processing, no data leaks, no monthly overages.
It reads the version, reference number, approval date, status, classification and approver name inside documents, and helps you filling for the fields automatically.
Upload a ZIP file and update directly from the admin panel. Automatic backups ensure you can always roll back.
SuperAdmin, Admin, Data Entry, and User roles with granular permission control. Restrict tabs per user or role.
Intuitive interface with inline editing, drag-and-drop column management, and a clean, familiar spreadsheet-like layout.
No hidden fees, no per-user charges, no surprise overages
One subscription plan covers your entire organization
Core people, vendor and exception tracking for small teams.
Adds asset, application and incident management for growing teams.
Full access to every module, integrations and branding.
Every plan includes a 14-day money-back guarantee.
Can't find what you need? Send us a message and we'll answer within one business day.
Get QuotationInfraTrace360 platform works on any web server that supports PHP 7.4+ running minimum on 1 Core CPU, 1 GB RAM, 5 GB storage and 1 MySQL database.
If you are planing to host it online, you can get your own online hosting plan from our certified partner HostingOthers.com with very low prices starting from $6.99 per month
Yes, this is a great choice! our support team can install it on your premises with the help of your IT department for no additional charges within Kuwait or remotly if your business is based on different country. with this choise, your data never leaves your server.
Absolutely. Export your data as XLSX from your systems, then use the built-in import feature to load it into InfraTrace360. The column headers will guide you through the mapping process.
The application becomes read-only. You can still view and reach all your data. To re-enable writes (create, edit, delete, import), simply get in touch to renew your license.
You can renew your license by contacting us via the contact us form.
Yes. we are located in Kuwait. If you needed any help with our platform, our team will be glad to assist you.
Yes. Admins can add custom fields (text, number, date, dropdown, yes/no) to any module. You can also rename any built-in field label. Changes update everywhere — forms, tables, exports, and print views.
Yes. Every account signs in with a password plus a six-digit code from an authenticator app such as Microsoft Authenticator or Google Authenticator. Setup is a one-time QR scan, and an admin can reset it if a phone is lost or replaced.
Yes. The whole application — screens, exports and the audit log — switches between English and Arabic, with a fully mirrored right-to-left layout.
Yes. The same package installs on Windows Server with IIS as well as on cPanel/Apache. The installer detects the web server and writes the matching protection rules for you.
Join hundreds of organizations that use InfraTrace360 to manage IT governance, pass audits, and stay ISO compliant